Microsoft Project 2010 Microsoft Project 2010 14.0.4763.1000 Miscellaneous Security Allow opening and saving Prompt when opening and saving Do not open or save Allows you manage whether users can open or save files in Project with file formats from previous versions or file formats that are not default. By default, users can not open or save files with formats from previous versions. Previous-version file formats Gregorian Calendar Hijri Calendar Thai Buddhist Allows you to manage whether the project summary task is displayed. If you enable this setting, the project summary task is displayed. If this setting is disabled or not configured, the user's default setting is used. Project Summary Task Allows users to access Project Server Web sites and Workspaces that have not been added to their trusted internet zones. If you enable this setting, users can access Project Server and Microsoft SharePoint Foundation sites that are not in their trusted internet zones. If this setting is disabled or not configured, users are required to add the Project Server and Microsoft SharePoint Foundation sites to their trusted internet site zones. Enable untrusted intranet zone access to Project server Allows you to set the default calendar type. You need to have the Complex Script and East Asian language packs installed on the operating system in order for this setting to be available. If you enable this setting, you can set the default calendar type. If you disable or do not configure this setting, the user's default setting is used. Calendar Type Most Recently Used Template List Length This setting determines the length of the recently used templates list in the New Document task pane (File New...). The maximum value is 9 and the minimum value is 0. This setting applies only applies to Project. Microsoft Project 2010 Project Options View Default View Specifies the view that Project displays at startup. If you enable this setting, you can set the default view that is displayed at startup. If you disable or do not configure this setting, the user's default setting is used. Bar Rollup Calendar Descriptive Network Diagram Detail Gantt Gantt Chart Leveling Gantt Milestone Date Rollup Milestone Rollup Network Diagram Relationship Diagram Resource Allocation Resource Form Resource Graph Resource Names Form Resource Sheet Resource Usage Task Details Form Task Entry Task Form Task Name Form Task Sheet Task Usage Tracking Gantt Date Format Specifies the format for displaying dates. Some information, such as time formats and the date separator, is set through the Control Panel. If you enable this setting, dates are displayed in the format you set. If you disable or do not configure this setting, the user's default setting is used. 1/31/00 12:33 PM 1/31/00 1/31/2000 January 31, 2000 12:33 PM January 31, 2000 Jan 31 12:33 PM Jan 31 '00 January 31 Jan 31 Mon 1/31/00 12:33 PM Mon 1/31/00 Mon Jan 31, '00 Mon 12:33 PM Mon Jan 31 Mon 1/31 Mon 31 1/31 31 12:33 PM W1/1 W1/1/00 12:33 PM Allows you to manage whether users can set the default currency type for their new project plans. If you enable this setting, the default currency type is enforced for all new project plans. If this setting is disabled or not configured, users can set the default currency type for new project plans. Default Project Currency United Arab Emirates, Dirhams Afghanistan, Afghanis Albania, Leke Armenia, Drams Netherlands Antilles, Guilders (also called Florins) Angola, Kwanza Argentina, Pesos Australia, Dollars Aruba, Guilders (also called Florins) Azerbaijan, Manats Bosnia and Herzegovina, Convertible Marka Barbados, Dollars Bangladesh, Taka Bulgaria, Leva Bahrain, Dinars Burundi, Francs Bermuda, Dollars Brunei Darussalam, Dollars Bolivia, Bolivianos Brazil, Brazil Real Bahamas, Dollars Bhutan, Ngultrum Botswana, Pulas Belarus, Rubles Belize, Dollars Canada, Dollars Congo//Kinshasa, Congolese Francs Switzerland, Francs Chile, Pesos China, Yuan Renminbi Colombia, Pesos Costa Rica, Colones Serbia, Dinars Cuba, Pesos Cape Verde, Escudos Cyprus, Pounds Czech Republic, Koruny Djibouti, Francs Denmark, Kroner Dominican Republic, Pesos Algeria, Algeria Dinars Estonia, Krooni Egypt, Pounds Eritrea, Nakfa Ethiopia, Birr Euro Member Countries, Euro Fiji, Dollars Falkland Islands (Malvinas), Pounds United Kingdom, Pounds Georgia, Lari Guernsey, Pounds Ghana, Cedis Gibraltar, Pounds Gambia, Dalasi Guinea, Francs Guatemala, Quetzales Guyana, Dollars Hong Kong, Dollars Honduras, Lempiras Croatia, Kuna Haiti, Gourdes Hungary, Forint Indonesia, Rupiahs Israel, New Shekels Isle of Man, Pounds India, Rupees Iraq, Dinars Iran, Rials Iceland, Kronur Jersey, Pounds Jamaica, Dollars Jordan, Dinars Japan, Yen Kenya, Shillings Kyrgyzstan, Soms Cambodia, Riels Comoros, Francs Korea (North), Won Korea (South), Won Kuwait, Dinars Cayman Islands, Dollars Kazakhstan, Tenge Laos, Kips Lebanon, Pounds Sri Lanka, Rupees Liberia, Dollars Lesotho, Maloti Lithuania, Litai Latvia, Lati Libya, Dinars Morocco, Dirhams Moldova, Lei Madagascar, Ariary Macedonia, Denars Myanmar (Burma), Kyats Mongolia, Tugriks Macau, Patacas Mauritania, Ouguiyas Malta, Liri Mauritius, Rupees Maldives (Maldive Islands), Rufiyaa Malawi, Kwachas Mexico, Pesos Malaysia, Ringgits Mozambique, Meticais Namibia, Dollars Nigeria, Nairas Nicaragua, Cordobas Norway, Krone Nepal, Nepal Rupees New Zealand, Dollars Oman, Rials Panama, Balboa Peru, Nuevos Soles Papua New Guinea, Kina Philippines, Pesos Pakistan, Rupees Poland, Zlotych Paraguay, Guarani Qatar, Rials Romania, New Lei Russia, Rubles Rwanda, Rwanda Francs Saudi Arabia, Riyals Solomon Islands, Dollars Seychelles, Rupees Sudan, Dinars Sweden, Kronor Singapore, Dollars Saint Helena, Pounds Slovenia, Tolars Slovakia, Koruny Sierra Leone, Leones Somalia, Shillings Seborga, Luigini Suriname, Dollars São Tome and Principe, Dobras El Salvador, Colones Syria, Pounds Swaziland, Emalangeni Thailand, Baht Tajikistan, Somoni Turkmenistan, Manats Tunisia, Dinars Tonga, Pa'anga Turkey, New Lira Trinidad and Tobago, Dollars Tuvalu, Tuvalu Dollars Taiwan, New Dollars Tanzania, Shillings Ukraine, Hryvnia Uganda, Shillings United States of America, Dollars Uruguay, Pesos Uzbekistan, Sums Venezuela, Bolivares Viet Nam, Dong Vanuatu, Vatu Samoa, Tala Communauté Financière Africaine BEAC, Francs Silver, Ounces Gold, Ounces East Caribbean Dollars International Monetary Fund (IMF) Special Drawing Rights Communauté Financière Africaine BCEAO, Francs Palladium Ounces Comptoirs Français du Pacifique Francs Platinum, Ounces Yemen, Rials South Africa, Rand Zambia, Kwacha Zimbabwe, Zimbabwe Dollars Show Status Bar Displays the status bar, which shows information about the progress of certain operations in Project. If you enable this setting, the option to display the status bar is selected. If you disable or do not configure this setting, the user's default setting is used. Automatically add new items to the global project This policy setting specifies whether new items (views, tables, filters, and groups) are automatically added to the global project so they are available in all of the projects. If you enable or do not configure this policy setting, new items will be automatically added to the global project. If you disable this policy setting, new items will not be automatically added to the global project. Windows in Taskbar Specifies whether separate windows are opened and displayed as separate buttons on the Windows taskbar for every open project. If you enable this setting, a new window is displayed in the taskbar for each open project. If you disable or do not configure this setting, the user's default setting is used. Scroll Bars Displays scrollbars for views. If you enable this setting, scrollbars are displayed in the views. If you disable or do not configure this setting, the user's default setting is used. Entry Bar Displays the entry bar, in which you can enter or edit field information. If you enable this setting, the entry bar is displayed. If you disable or do not configure this setting, the user's default setting is used. OLE Link Indicators Displays the indicator for OLE linked objects in the lower-right corner of the cell that contains the link. If you enable this setting, the indicator is displayed for OLE linked objects. If you disable or do not configure this setting, the user's default setting is used. Project Screentips Displays tips for Gantt bars and field headings, including dates for timescale units, and the full cell contents if a cell is too narrow to completely display the text in sheet and Network Diagram views. If you enable this setting, tips are displayed fro Gantt bars and field headings. If you disable or do not configure this setting, the user's default setting is used. General Undo Levels Limits the number of actions (1-99) that a user can undo. If you enable this setting, you can set a limit on the number of actions (1-99) a user is can undo. If you disable this setting or do not configure it, the user's default setting is used. General options for Microsoft Project Open last file on startup Upon starting Project, automatically opens the last used project file. If you enable this setting, the last file that the user had open automatically re-opens when they start Project. If you disable or do not configure this setting, the user's default setting is used. Prompt for project info for new projects Opens the Project Information dialog box whenever the user creates a new project. If you enable this setting, the Project Information dialog box is displayed whenever you create a new project. If you disable or do not configure this setting, the users default setting is followed. Set AutoFilter on for new projects This policy setting turns on AutoFilter automatically when the user creates a new project. If you enable or do not configure this policy setting, AutoFilter is automatically turned on when users create a new project. If you disable this policy setting, AutoFilter is not automatically turned on when users create a new project. Recently used file list (MRU) Sets the number of recently opened project files that display in the list at the bottom of the File menu. If you enable this setting, the number of files displayed at the bottom of the File menu corresponds to the number you set. If you disable or do not configure this setting, the user's default setting is used. Number of entries: General options for 'Project1' Display Developer tab in the Ribbon This policy setting controls whether the Developer tab will be displayed in the Ribbon. If you enable this policy setting, the Developer tab will be displayed in the Ribbon. If you disable this policy setting, the Developer tab will not be displayed in the Ribbon. If you do not configure this policy setting, the Developer tab will not be displayed in the Ribbon, but its visibility can be changed via a setting in the application Options dialog box. Customize Ribbon Automatically add new resources and tasks Automatically adds new resources to the resource pool and assigns them default values whenever a new resource name or new resource's initials are added. If you enable this setting, new resources and tasks are automatically inserted into the project. If you disable this setting, users are alerted whenever a new resource or task is created when making a new assignment. If you do not configure this setting, the user's default setting is used. Default standard rate Specifies the standard pay rate for new resources. If you enable this setting, all new resources will use the specified standard pay rate. If you disable or do not configure this setting, the user's default setting is used. 0.00/h Default overtime rate Specifies the overtime pay rate for new resources. If you enable this setting, all new resources will use the specified overtime pay rate If you disable or do not configure this setting, the user's default setting is used. 0.00/h Edit Edit options for Microsoft Project Allow cell drag and drop Move selection after enter Ask to update automatic links Edit directly in cell Allow fields in sheets to be moved using the mouse. If you enable this setting, users can move rows and fields to new locations using the mouse. If you disable or do not configure this setting, the user's default setting is used. Automatically selects the field below the current field after the user presses the ENTER key. If you enable this setting, the field below the current field is selected after the user presses the ENTER key. If you disable or do not configure this setting, the user's default setting is used. Prompts the user to update linked objects whenever they open a file containing OLE links, if the source has changed. If you enable this setting, users are prompted to update linked objects whose source has changed whenever they open a file containing OLE links. If you disable or do not configure this setting, the user's default setting is used. Allows editing directly in the selected cell. If you enable this setting, users can directly edit a cell's value. If you disable or do not configure this setting, the user's default setting is used. View options for time units in 'Project1' Minutes Sets the label for minutes. If you enable this setting, minutes are displayed with the specified label. If you disable or do not configure this setting, the user's default setting is used. m min minute Hours Sets the label for hours. If you enable this setting, hours are displayed with the specified label. If you disable or do not configure this setting, the user's default setting is used. h hr hour Days Sets the label for days. If you enable this setting, days are displayed with the specified label. If you disable or do not configure this setting, the user's default setting is used. d dy day Weeks Sets the label for weeks. If you enable this setting, weeks are displayed with the specified label. If you disable or do not configure this setting, the user's default setting is used. w wk week Months Sets the label for months. If you enable this setting, months are displayed with the specified label. If you disable or do not configure this setting, the user's default setting is used. mo mon month Years Sets the label for years. If you enable this setting, years are displayed with the specified label. If you disable or do not configure this setting, the user's default setting is used. y yr year Add space before label Adds a space between numbers and time unit labels. If you enable this setting, a space is displayed between numbers and the time unit label. If you disable or do not configure this setting, the user's default setting is used. Hyperlink appearance in 'Project1' Hyperlink color Specifies the color of hyperlinks that have not yet been followed. If you enable this setting, hyperlinks that have not been followed are displayed in the color you specified. If you disable or do not configure this setting, the user's default setting is used. Automatic Black Red Yellow Lime Aqua Blue Fuchsia White Maroon Green Olive Navy Purple Teal Gray Silver Followed hyperlink color Specifies the color of hyperlinks that have already been followed. If you enable this setting, hyperlinks that have been followed are displayed in the color you specified. If you disable or do not configure this setting, the user's default setting is used. Underline hyperlinks Shows hyperlinks with underlined text. If you enable this setting, hyperlinks are underlined. If you disable or do not configure this setting, the user's default setting is used. Calendar Week starts on Specifies the day of the week on which you want the scheduling week to begin. If you enable this setting, weeks will start on the day you specified. If you disable or do not configure this setting, the user's default setting is used. Sunday Monday Tuesday Wednesday Thursday Friday Saturday Fiscal year starts in Specifies the month that begins the fiscal year. If you enable this setting, the fiscal year will start on the month you specified. If you disable or do not configure this setting, the user's default setting is used. January February March April May June July August September October November December Use starting year for FY numbering Labels the fiscal year using the calendar year in which the fiscal year begins. If you enable this setting, the label for the fiscal year is the calendar year in which the fiscal year begins. If you disable or do not configure this setting, the user's default setting is used. Default start time Specifies the start time that Project assigns to tasks by default when you enter a start date without specifying a time. If you enable this setting, new tasks where the user does not enter a start time will use the start time that you specified. If you disable or do not configure this setting, the user's default setting is used. Default end time Specifies the finish time that Project assigns to tasks by default when you enter a finish date without specifying a time. If you enable this setting, new tasks where the user does not enter an end time will have the end time that you specified. If you disable or do not configure this setting, the user's default setting is used. Default start time (Minutes after 12am * 10) Default end time (Minutes after 12am * 10) Hours per day Defines the number of hours that you want Project to assign to a task when the user enters a duration of one day. If you enable this setting, day-long tasks will be assigned the number of hours that you specified. If you disable or do not configure this setting, the user's default setting is used. 8 Hours per week Specifies the number of hours that you want Project to assign to a task when the user enters a duration of one week. If you enable this setting, week-long tasks will be assigned the number of hours that you specified. If you disable or do not configure this setting, the user's default setting is used. 40 Days per month Defines the number of days that you want Project to assign to a task when you enter a duration of a month. If you enable this setting, month-long tasks will be assigned the number of days that you specified. If you disable or do not configure this setting, the user's default setting is used. Schedule Schedule options for Microsoft Project Show scheduling messages Displays messages about schedule inconsistencies, such as a successor task starting before the finish of the predecessor task. If you enable this setting, users will be alerted about scheduling inconsistencies. If you disable or do not configure this setting, the user's default setting is used. Show assignment units as Shows resource assignments units as a decimal or percentage. If you enable this setting, resource assignment units will be set to the option you choose from the list. If you disable or do not configure this setting, the user's default setting is used. Percentage Decimal Scheduling options for 'Project1' New tasks Specifies the default start date for new tasks as they are entered in the current project. For projects scheduled from the start date, the options are "Start on Project Start Date" and "Start on Current Date." For projects scheduled from the finish date, the options are "Finish on Project Finish Date" and "Start on Current Date." If you enable this setting, new tasks will start on the date you specified. If you disable or do not configure this setting, the user's default setting is used. Set default start date for new tasks This policy setting specifies the default start date for new tasks as they are entered in the current project. For projects scheduled from the start date, the options are "Start on Project Start Date" and "Start on Current Date." For projects scheduled from the finish date, the options are "Finish on Project Finish Date" and "Start on Current Date." If you enable or do not configure this policy setting, new tasks will start on the project start date. If you disable this policy setting, new tasks will not start on the project start date. Set new tasks to be automatically scheduled This policy setting will set new tasks to be automatically scheduled. If you enable this policy setting, new tasks will be automatically scheduled. If you disable or do not configure this policy setting, new tasks will be manually scheduled. Update manually scheduled tasks when editing links This policy setting will allow the update of manually scheduled task dates when predecessor links are created or updated. If you enable or do not configure this policy setting, manually scheduled task dates will be updated when predecessor links are created or updated. If you disable this policy setting, manually scheduled task dates will not be updated when predecessor links are created or updated. Start on Project Start Date Start on Current Date Duration is entered in Specifies the unit of time (minutes, hours, days, weeks, or months) used by default in the Duration field. If you enable this setting, the unit you specify will be used if the user does not specify a unit of time when entering a duration. If you disable or do not configure this setting, the user's default setting is used. Tasks can be made inactive This policy setting will allow tasks to be inactivated. If you enable or do not configure this policy setting, users will be able to use the Inactive tasks feature, and tasks are allowed to be inactivated. If you disable this policy setting, tasks cannot be inactivated. Keep tasks on nearest working day This policy setting will enable a constraint to be applied to tasks when they are toggled from Manually Scheduled Mode to Automatically Scheduled Mode, allowing the task date to be as close to the user-entered date as possible. If you enable this policy setting, the task date will be as close to the user-entered date as possible when tasks are toggled from Manually Scheduled Mode to Automatically Scheduled Mode. If you disable or do not configure this policy setting, the task date will not to be as close to the user-entered date when tasks are toggled from Manually Scheduled Mode to Automatically Scheduled Mode. Show tasks schedule warnings This policy setting will allow the display of red task warnings to indicate potential problems. If you enable or do not configure this policy setting, a red task warning will be displayed to indicate potential problems. If you disable this policy setting, a red task warning will not be displayed to indicate potential problems. Show tasks schedule suggestions This policy setting will allow the display of green task suggestions to indicate potential optimization. If you enable this policy setting, a green task suggestion will be displayed to indicate potential problems. If you disable or do not configure this policy setting, a green task suggestion will not be displayed to indicate potential problems. Minutes Hours Days Weeks Months Work is entered in Specifies the default unit of time (minutes, hours, days, weeks, or months) used in the Work field in the current project. If you enable this setting, whenever Project displays work values, the unit you specified will be used. If you disable or do not configure this setting, the user's default setting is used. Minutes Hours Days Weeks Months Default task type Specifies the default task type for new tasks. If you enable this setting, new tasks will be set to the type that you specified. If you disable or do not configure this setting, the user's default setting is used. Fixed Duration Fixed Units Fixed Work New tasks are effort driven This policy setting specifies that new tasks are scheduled such that the work on the task remains constant as you add or remove assignments. If you enable this policy setting, new tasks will be effort-driven. If you disable or do not configure this policy setting, new tasks will not be effort-driven. Autolink inserted or moved tasks This policy setting automatically links tasks when you cut, move, or insert them. If you enable this policy setting, tasks will automatically be linked when you cut, move, or insert them. If you disable or do not configure this policy setting, tasks will not automatically be linked when you cut, move, or insert them. Split in-progress tasks Allows rescheduling of remaining duration and work when a task slips or reports progress ahead of schedule. If you enable this setting, the remaining duration and work will be rescheduled if a task slips or reports progress ahead of schedule. If you disable or do not configure this setting, the user's default setting is used. Tasks will always honor their constraint dates Specifies that Project schedules tasks according to their constraint dates. If you enable this setting, task constraints will always be honored when tasks are scheduled. If you disable or do not configure this setting, the user's default setting is used. Show that tasks have estimated durations Displays a question mark (?) after the duration unit of any task with an estimated duration. If you enable this setting, tasks with estimated durations have a question mark after their duration unit. If you disable or do not configure this setting, the user's default setting is used. New tasks have estimated durations Specifies that all new tasks have estimated durations. If you enable this setting, all new tasks will require estimated durations. If you disable or do not configure this setting, the user's default setting is used. Calculation Calculation options for Microsoft Project Automatic Calculation Specifies that calculations should be done automatically as soon as a change is made. If you enable this setting, calculations will be made after every change to the project. If you disable or do not configure this setting, the user's default setting is used. Calculate all open projects Specifies that Project should recalculate all open projects. If you enable this setting, all open projects will be recalculated anytime Project does a calculation. If you disable or do not configure this setting, the user's default setting is used. Calculation options for 'Project1' Updating task status updates resource status Automatically updates resource status, such as actual and remaining work and cost, whenever you update task status, such as percent complete, actual duration, or remaining duration. If you enable this setting, task status updates are automatically applied to resources. If you disable or do not configure this setting, the user's default setting is used. Edits to total task % complete will be spread to the status date Distributes the changes to total percent complete evenly across the schedule to the project status date (or to the current date if you haven't specified a project status date). If you enable this setting, edits to total task percent complete are evenly distributed across the schedule up to the status date. If you disable or do not configure this setting, the user's default setting is used. Inserted projects are calculated like summary tasks Specifies that a single critical path is calculated throughout the master project, by treating inserted projects as summary tasks in the master project. If you enable this setting, the critical path is calculated by treating inserted projects as summary tasks. If you disable or do not configure this setting, the user's default setting is used. Actual costs are always calculated by Microsoft Project Specifies that Project calculates actual costs automatically, based upon resource rates, per-use resource costs, and fixed task costs. If you enable this setting, Project will automatically calculate actual costs. If you disable or do not configure this setting, the user's default setting is used. Edits to total actual cost will be spread to the status date Distributes the changes to total actual cost evenly across the schedule to the status date (or to the current date if you have not specified a project status date). If you enable this setting, Project will distribute edits to actual cost evenly across a task up to the status date. If you disable or do not configure this setting, the user's default setting is used. Default fixed costs accrual Specifies how Project sets the fixed cost accrual for new tasks. If you enable this setting, new tasks will accrue fixed cost according to the specification you made. If you disable or do not configure this setting, the user's default setting is used. Start Prorated End Calculate multiple critical paths Specifies that Project should calculate and display a critical path for each independent network of tasks within the project. If you enable this setting, Project will calculate multiple critical paths. If you disable or do not configure this setting, the user's default setting is used. Tasks are critical if slack is less than or equal to Specifies the number of days of slack Project uses to determine critical tasks. If you enable this setting, tasks are marked as critical if the slack is less than or equal to the value you specified. If you disable or do not configure this setting, the user's default setting is used. Move end of completed parts after status date back to status date Moves the completed portion of a task back to finish at the status date. If you enable this setting, the completed portion of the task moves back to finish at the status date. If you disable or do not configure this setting, the user's default setting is used. And move start of remaining parts back to status date Moves the remaining portion of a task back to start at the status date. If you enable this setting, the remaining portion of the task moves back to start at the status date. If you disable or do not configure this setting, the user's default setting is used. Move start of remaining parts before status date forward to status date Moves remaining portions of a task forward to start at the status date. If you enable this setting, the remaining portion of the task moves forward to start at the status date. If you disable or do not configure this setting, the user's default setting is used. And move end of completed parts forward to status date Moves the completed portion of a task forward to finish at the status date. If you enable this setting, the completed portion of the task moves forward to finish at the status date. If you disable or do not configure this setting, the user's default setting is used. Earned Value options for Project1 Default task Earned Value method Specifies the method used for earned value analysis. If you enable this setting, Project will calculate earned value using the method you specified. If you disable or do not configure this setting, the user's default setting is used. % Complete Physical % Complete Baseline for Earned Value calculations Specifies the baseline that is used to measure project performance using earned value analysis. If you enable this setting, Project will calculate earned value using the baseline you specified. If you disable or do not configure this setting, the user's default setting is used. Baseline Baseline 1 Baseline 2 Baseline 3 Baseline 4 Baseline 5 Baseline 6 Baseline 7 Baseline 8 Baseline 9 Baseline 10 Save Save Microsoft Project files as Specifies the default file format that should be applied when any Project file is saved. If you enable this setting, project files will be saved with the format you specified. If you disable or do not configure this setting, the user's default setting is used. Project (*.mpp) Template (*.mpt) Project 2000-2003 (*.mpp) File locations Projects Specifies the default location in the computer system for saving and opening projects. If you enable this policy setting, the location first appears in the Open and Save As dialog box. If you disable or do not configure this policy setting, the users default for this setting is followed. User Templates Specifies the default location in the computer system for saving and opening workgroup templates. If you enable this policy setting, the location first appears in the Open and Save As dialog box. If you disable or do not configure this policy setting, the users default for this setting is followed. Auto Save Options Auto Save every Specifies that you want Project to automatically save your projects periodically. If you enable this setting, Project will save users projects at the specified interval. If you disable or do not configure this setting, the user's default setting is used. Save Interval Specifies how often Project should automatically save your projects. This setting is only used by Project if Auto Save has been turned on. If you enable this setting, Project will save users projects at the specified interval. If you disable or do not configure this setting, the user's default setting is used. Save Active Project only Saves only the active project at the interval you specify. This setting is only used by Project if Auto Save is turned on. If you enable this setting, Project will only save the active project at specified intervals. If you disable or do not configure this setting, the user's default setting is used. Prompt before saving Specifies whether Project should prompt the user before saving their project as a result of the Auto Save function. If you enable this setting, users will be prompted before their project is automatically saved. If you disable or do not configure this setting, the user's default setting is used. Interface Show indicators and Option butons for Resource Assigments Specifies that the feedback triangle should appear in a corner of a field if the user assigns additional resources to a task that already has resources assigned. If you enable this setting, a feedback triangle is displayed in the corner of a field if users assign additional resources to a task that already has resources assigned. If you disable or do not configure this setting, the user's default setting is used. Edits to work, units or duration Specifies that the feedback triangle should appear in a corner of a Task Name field if you change the task's start date or finish date. If you enable this setting, a feedback triangle is displayed in the corner of the Task Name field if the user changes the task's start or finish date. If you disable or do not configure this setting, the user's default setting is used. Edits to start and finish dates Specifies that the feedback triangle should appear in a corner of the Duration field or the Task Name field if you change a task's work, units, or duration. If you enable this setting, a feedback triangle is displayed in the corner of the Duration or Task Name field if the user changes the task's work, units, or duration. If you disable or do not configure this setting, the user's default setting is used. Deletions in the Name column Specifies that the delete indicator should appear in the Indicators field if you delete text in the Task Name or Resource Names field. If you enable this setting, the delete indicator will appear if the user deletes a Task Name or Resource Names. If you disable or do not configure this setting, the user's default setting is used. Project Guide settings Display Project Guide Displays the side pane containing the Project Guide. If you enable this setting, the Project Guide will be displayed. If you disable or do not configure this setting, the user's default setting is used. Project Guide settings for 'Project1' Project Guide Functionality and Layout page Choose whether the side pane displays the default Project Guide or a custom Project Guide your organization has developed. If you enable this setting, the Project Guide you specified will be displayed when the Project Guide is opened. If you disable or do not configure this setting, the user's default setting is used. Use Microsoft Project's Default page Use a custom page URL: gbui://mainpage.htm Project Guide Content Specifies whether the side pane displays the Project Guide content that comes with Project or custom content that your organization has developed. If you enable this setting, content for the Project Guide is loaded from the specified location. If you disable or do not configure this setting, the user's default setting is used. Use Microsoft Project's default content Use custom content XML file for custom content: gbiu://gbui.xml Disable Internal ID Matching Prevent internal id matching. If you enable this setting, Project will not use internal identifiers to match different-language or renamed Organizer items between projects. If this setting is disabled or not configured, internal identifiers will be used to match different-language or renamed Organizer items between projects. Tools | Macro Security Trust Center Cryptography Set CNG cipher algorithm This policy setting allows you to configure the CNG cipher algorithm that is used. If you enable this policy setting, then the cipher provided will be used if it is a supported algorithm. If you disable or do not configure this policy setting, AES will be used. Configure CNG cipher chaining mode This policy setting allows you to configure the cipher chaining mode used. If you enable this policy setting, the cipher chaining mode specified will be applied. If you disable or do not configure this policy setting, Cipher Block Chaining (CBC) will be the default CNG cipher chaining mode used. Cipher Block Chaining (CBC) Cipher Feedback (CFB) Set CNG cipher key length This policy setting allows you to configure the number of bits to use when creating the cipher key. This number will be rounded down to a multiple of 8. If you enable this policy setting, the key bits specified will be used. If you disable or do not configure this policy setting, the default value will be used. Set parameters for CNG context This policy setting allows you to specify the encryption parameters that should be used for the CNG context. If you enable this policy setting, the parameters specified will be passed to the CNG context. If you disable or do not configure this policy setting, the default CNG values will be used. Specify CNG hash algorithm This policy setting allows you to specify the hash algorithm used. If you enable this policy setting, the hashing algorithm selected will be used by CNG. If you disable or do not configure this policy setting, the default CNG hash algorithm will be used. SHA1 SHA256 SHA384 SHA512 Set CNG password spin count This policy setting allows you to specify the number of times to spin (rehash) the password verifier. If you enable this policy setting, the number specified will be the number of times the password will be rehashed. If you disable or do not configure this policy setting, the default (100000) will be used. Specify CNG random number generator algorithm This policy setting allows you to configure the CNG random number generator to use. If you enable this policy setting, the random number generator specified will be used. If you disable or do not configure this policy setting, the default random number generator will be used. Specify CNG salt length This policy setting allows you to specific the number of bytes of salt that should be used. If you enable this policy setting, the bytes specified will be used. If you disable or do not configure this policy setting, the default length or 16 will be used. Turn off Data Execution Prevention This policy setting allows you to turn on and off Data Execution Prevention (DEP) for Project. DEP is a set of hardware and software technologies that perform additional checks on memory to help prevent malicious code from running on a system. The primary benefit of DEP is to help prevent code execution from data pages. If you enable this policy setting, you will turn off DEP for Project. If you disable or do not configure this policy setting, you will turn on DEP for Project. Security Level Specifies the level of security used when opening documents. If you enable this policy setting, the security level you specified will be used when user open documents. If you disable or do not configure this policy setting, the users default for this setting is followed. Low (not recommended) Medium High Very High Tools | Local Project Cache Local Project Cache Location Sets the location path of the local project cache on the user's computer. Local Project Cache Size Limit in MB Sets the size limit in MB of the local project cache. This is applied per user profile. If this setting is enabled, the size of the cache will be set to the number specified. If this setting is disabled or not configured, users are able to set the cache size limit. New tasks Duration is entered in Default fixed costs accrual Days Minutes Save Microsoft Project files as Projects Calendar Type Calendar Type Project Guide Content Default task Earned Value method Project Guide Functionality and Layout page Default overtime rate Work is entered in Local Project Cache Location Local Project Cache Size Limit in MB User Templates Days per month Years Weeks Week starts on Hyperlink color Tasks are critical if slack is less than or equal to Save Interval Security Level Months Show assignment units as Hours per week Followed hyperlink color Default task type Hours Undo Levels Baseline for Earned Value calculations Hours per day Fiscal year starts in Default View Most Recently Used Template List Length Default standard rate Date Format Calendar Type Default View Date Format Default Project Currency Undo Levels Number of entries: 0.00/h 0.00/h Minutes Hours Days Weeks Months Years Hyperlink color Followed hyperlink color Week starts on Fiscal year starts in Default start time (Minutes after 12am * 10) Default end time (Minutes after 12am * 10) 8 40 Days per month Show assignment units as New tasks Duration is entered in Work is entered in Default task type Default task Earned Value method Baseline for Earned Value calculations Default fixed costs accrual Tasks are critical if slack is less than or equal to Save Microsoft Project files as Save Interval Project Guide Functionality and Layout page gbui://mainpage.htm Project Guide Content gbiu://gbui.xml Cipher key length Number of bytes Security Level Local Project Cache Size Limit in MB Most Recently Used Template List Length