Microsoft Project 2010Microsoft Project 201014.0.4763.1000MiscellaneousSecurityAllow opening and savingPrompt when opening and savingDo not open or saveAllows you manage whether users can open or save files in Project with file formats from previous versions or file formats that are not default. By default, users can not open or save files with formats from previous versions.Previous-version file formatsGregorian CalendarHijri CalendarThai BuddhistAllows you to manage whether the project summary task is displayed. If you enable this setting, the project summary task is displayed. If this setting is disabled or not configured, the user's default setting is used.Project Summary TaskAllows users to access Project Server Web sites and Workspaces that have not been added to their trusted internet zones. If you enable this setting, users can access Project Server and Microsoft SharePoint Foundation sites that are not in their trusted internet zones. If this setting is disabled or not configured, users are required to add the Project Server and Microsoft SharePoint Foundation sites to their trusted internet site zones.Enable untrusted intranet zone access to Project serverAllows you to set the default calendar type. You need to have the Complex Script and East Asian language packs installed on the operating system in order for this setting to be available. If you enable this setting, you can set the default calendar type. If you disable or do not configure this setting, the user's default setting is used.Calendar TypeMost Recently Used Template List LengthThis setting determines the length of the recently used templates list in the New Document task pane (File New...). The maximum value is 9 and the minimum value is 0. This setting applies only applies to Project.Microsoft Project 2010Project OptionsViewDefault ViewSpecifies the view that Project displays at startup.
If you enable this setting, you can set the default view that is displayed at startup.
If you disable or do not configure this setting, the user's default setting is used.Bar RollupCalendarDescriptive Network DiagramDetail GanttGantt ChartLeveling GanttMilestone Date RollupMilestone RollupNetwork DiagramRelationship DiagramResource AllocationResource FormResource GraphResource Names FormResource SheetResource UsageTask Details FormTask EntryTask FormTask Name FormTask SheetTask UsageTracking GanttDate FormatSpecifies the format for displaying dates. Some information, such as time formats and the date separator, is set through the Control Panel.
If you enable this setting, dates are displayed in the format you set.
If you disable or do not configure this setting, the user's default setting is used.1/31/00 12:33 PM1/31/001/31/2000January 31, 2000 12:33 PMJanuary 31, 2000Jan 31 12:33 PMJan 31 '00January 31Jan 31Mon 1/31/00 12:33 PMMon 1/31/00Mon Jan 31, '00Mon 12:33 PMMon Jan 31Mon 1/31Mon 311/313112:33 PMW1/1W1/1/00 12:33 PMAllows you to manage whether users can set the default currency type for their new project plans. If you enable this setting, the default currency type is enforced for all new project plans. If this setting is disabled or not configured, users can set the default currency type for new project plans.Default Project CurrencyUnited Arab Emirates, DirhamsAfghanistan, AfghanisAlbania, LekeArmenia, DramsNetherlands Antilles, Guilders (also called Florins)Angola, KwanzaArgentina, PesosAustralia, DollarsAruba, Guilders (also called Florins)Azerbaijan, ManatsBosnia and Herzegovina, Convertible MarkaBarbados, DollarsBangladesh, TakaBulgaria, LevaBahrain, DinarsBurundi, FrancsBermuda, DollarsBrunei Darussalam, DollarsBolivia, BolivianosBrazil, Brazil RealBahamas, DollarsBhutan, NgultrumBotswana, PulasBelarus, RublesBelize, DollarsCanada, DollarsCongo//Kinshasa, Congolese FrancsSwitzerland, FrancsChile, PesosChina, Yuan RenminbiColombia, PesosCosta Rica, ColonesSerbia, DinarsCuba, PesosCape Verde, EscudosCyprus, PoundsCzech Republic, KorunyDjibouti, FrancsDenmark, KronerDominican Republic, PesosAlgeria, Algeria DinarsEstonia, KrooniEgypt, PoundsEritrea, NakfaEthiopia, BirrEuro Member Countries, EuroFiji, DollarsFalkland Islands (Malvinas), PoundsUnited Kingdom, PoundsGeorgia, LariGuernsey, PoundsGhana, CedisGibraltar, PoundsGambia, DalasiGuinea, FrancsGuatemala, QuetzalesGuyana, DollarsHong Kong, DollarsHonduras, LempirasCroatia, KunaHaiti, GourdesHungary, ForintIndonesia, RupiahsIsrael, New ShekelsIsle of Man, PoundsIndia, RupeesIraq, DinarsIran, RialsIceland, KronurJersey, PoundsJamaica, DollarsJordan, DinarsJapan, YenKenya, ShillingsKyrgyzstan, SomsCambodia, RielsComoros, FrancsKorea (North), WonKorea (South), WonKuwait, DinarsCayman Islands, DollarsKazakhstan, TengeLaos, KipsLebanon, PoundsSri Lanka, RupeesLiberia, DollarsLesotho, MalotiLithuania, LitaiLatvia, LatiLibya, DinarsMorocco, DirhamsMoldova, LeiMadagascar, AriaryMacedonia, DenarsMyanmar (Burma), KyatsMongolia, TugriksMacau, PatacasMauritania, OuguiyasMalta, LiriMauritius, RupeesMaldives (Maldive Islands), RufiyaaMalawi, KwachasMexico, PesosMalaysia, RinggitsMozambique, MeticaisNamibia, DollarsNigeria, NairasNicaragua, CordobasNorway, KroneNepal, Nepal RupeesNew Zealand, DollarsOman, RialsPanama, BalboaPeru, Nuevos SolesPapua New Guinea, KinaPhilippines, PesosPakistan, RupeesPoland, ZlotychParaguay, GuaraniQatar, RialsRomania, New LeiRussia, RublesRwanda, Rwanda FrancsSaudi Arabia, RiyalsSolomon Islands, DollarsSeychelles, RupeesSudan, DinarsSweden, KronorSingapore, DollarsSaint Helena, PoundsSlovenia, TolarsSlovakia, KorunySierra Leone, LeonesSomalia, ShillingsSeborga, LuiginiSuriname, DollarsSão Tome and Principe, DobrasEl Salvador, ColonesSyria, PoundsSwaziland, EmalangeniThailand, BahtTajikistan, SomoniTurkmenistan, ManatsTunisia, DinarsTonga, Pa'angaTurkey, New LiraTrinidad and Tobago, DollarsTuvalu, Tuvalu DollarsTaiwan, New DollarsTanzania, ShillingsUkraine, HryvniaUganda, ShillingsUnited States of America, DollarsUruguay, PesosUzbekistan, SumsVenezuela, BolivaresViet Nam, DongVanuatu, VatuSamoa, TalaCommunauté Financière Africaine BEAC, FrancsSilver, OuncesGold, OuncesEast Caribbean DollarsInternational Monetary Fund (IMF) Special Drawing RightsCommunauté Financière Africaine BCEAO, FrancsPalladium OuncesComptoirs Français du Pacifique FrancsPlatinum, OuncesYemen, RialsSouth Africa, RandZambia, KwachaZimbabwe, Zimbabwe DollarsShowStatus BarDisplays the status bar, which shows information about the progress of certain operations in Project.
If you enable this setting, the option to display the status bar is selected.
If you disable or do not configure this setting, the user's default setting is used.Automatically add new items to the global projectThis policy setting specifies whether new items (views, tables, filters, and groups) are automatically added to the global project so they are available in all of the projects.
If you enable or do not configure this policy setting, new items will be automatically added to the global project.
If you disable this policy setting, new items will not be automatically added to the global project.Windows in TaskbarSpecifies whether separate windows are opened and displayed as separate buttons on the Windows taskbar for every open project.
If you enable this setting, a new window is displayed in the taskbar for each open project.
If you disable or do not configure this setting, the user's default setting is used.Scroll BarsDisplays scrollbars for views.
If you enable this setting, scrollbars are displayed in the views.
If you disable or do not configure this setting, the user's default setting is used.Entry BarDisplays the entry bar, in which you can enter or edit field information.
If you enable this setting, the entry bar is displayed.
If you disable or do not configure this setting, the user's default setting is used.OLE Link IndicatorsDisplays the indicator for OLE linked objects in the lower-right corner of the cell that contains the link.
If you enable this setting, the indicator is displayed for OLE linked objects.
If you disable or do not configure this setting, the user's default setting is used.Project ScreentipsDisplays tips for Gantt bars and field headings, including dates for timescale units, and the full cell contents if a cell is too narrow to completely display the text in sheet and Network Diagram views.
If you enable this setting, tips are displayed fro Gantt bars and field headings.
If you disable or do not configure this setting, the user's default setting is used.GeneralUndo LevelsLimits the number of actions (1-99) that a user can undo. If you enable this setting, you can set a limit on the number of actions (1-99) a user is can undo. If you disable this setting or do not configure it, the user's default setting is used.General options for Microsoft ProjectOpen last file on startupUpon starting Project, automatically opens the last used project file.
If you enable this setting, the last file that the user had open automatically re-opens when they start Project.
If you disable or do not configure this setting, the user's default setting is used.Prompt for project info for new projectsOpens the Project Information dialog box whenever the user creates a new project.
If you enable this setting, the Project Information dialog box is displayed whenever you create a new project.
If you disable or do not configure this setting, the users default setting is followed.Set AutoFilter on for new projectsThis policy setting turns on AutoFilter automatically when the user creates a new project.
If you enable or do not configure this policy setting, AutoFilter is automatically turned on when users create a new project.
If you disable this policy setting, AutoFilter is not automatically turned on when users create a new project.Recently used file list (MRU)Sets the number of recently opened project files that display in the list at the bottom of the File menu.
If you enable this setting, the number of files displayed at the bottom of the File menu corresponds to the number you set.
If you disable or do not configure this setting, the user's default setting is used.Number of entries: General options for 'Project1'Display Developer tab in the RibbonThis policy setting controls whether the Developer tab will be displayed in the Ribbon.
If you enable this policy setting, the Developer tab will be displayed in the Ribbon.
If you disable this policy setting, the Developer tab will not be displayed in the Ribbon.
If you do not configure this policy setting, the Developer tab will not be displayed in the Ribbon, but its visibility can be changed via a setting in the application Options dialog box.Customize RibbonAutomatically add new resources and tasksAutomatically adds new resources to the resource pool and assigns them default values whenever a new resource name or new resource's initials are added.
If you enable this setting, new resources and tasks are automatically inserted into the project.
If you disable this setting, users are alerted whenever a new resource or task is created when making a new assignment.
If you do not configure this setting, the user's default setting is used.Default standard rateSpecifies the standard pay rate for new resources.
If you enable this setting, all new resources will use the specified standard pay rate.
If you disable or do not configure this setting, the user's default setting is used.0.00/hDefault overtime rateSpecifies the overtime pay rate for new resources.
If you enable this setting, all new resources will use the specified overtime pay rate
If you disable or do not configure this setting, the user's default setting is used.0.00/hEditEdit options for Microsoft ProjectAllow cell drag and dropMove selection after enterAsk to update automatic linksEdit directly in cellAllow fields in sheets to be moved using the mouse.
If you enable this setting, users can move rows and fields to new locations using the mouse.
If you disable or do not configure this setting, the user's default setting is used.Automatically selects the field below the current field after the user presses the ENTER key.
If you enable this setting, the field below the current field is selected after the user presses the ENTER key.
If you disable or do not configure this setting, the user's default setting is used.Prompts the user to update linked objects whenever they open a file containing OLE links, if the source has changed.
If you enable this setting, users are prompted to update linked objects whose source has changed whenever they open a file containing OLE links.
If you disable or do not configure this setting, the user's default setting is used.Allows editing directly in the selected cell.
If you enable this setting, users can directly edit a cell's value.
If you disable or do not configure this setting, the user's default setting is used.View options for time units in 'Project1'MinutesSets the label for minutes.
If you enable this setting, minutes are displayed with the specified label.
If you disable or do not configure this setting, the user's default setting is used.mminminuteHoursSets the label for hours.
If you enable this setting, hours are displayed with the specified label.
If you disable or do not configure this setting, the user's default setting is used.hhrhourDaysSets the label for days.
If you enable this setting, days are displayed with the specified label.
If you disable or do not configure this setting, the user's default setting is used.ddydayWeeksSets the label for weeks.
If you enable this setting, weeks are displayed with the specified label.
If you disable or do not configure this setting, the user's default setting is used.wwkweekMonthsSets the label for months.
If you enable this setting, months are displayed with the specified label.
If you disable or do not configure this setting, the user's default setting is used.momonmonthYearsSets the label for years.
If you enable this setting, years are displayed with the specified label.
If you disable or do not configure this setting, the user's default setting is used.yyryearAdd space before labelAdds a space between numbers and time unit labels.
If you enable this setting, a space is displayed between numbers and the time unit label.
If you disable or do not configure this setting, the user's default setting is used.Hyperlink appearance in 'Project1'Hyperlink colorSpecifies the color of hyperlinks that have not yet been followed.
If you enable this setting, hyperlinks that have not been followed are displayed in the color you specified.
If you disable or do not configure this setting, the user's default setting is used.AutomaticBlackRedYellowLimeAquaBlueFuchsiaWhiteMaroonGreenOliveNavyPurpleTealGraySilverFollowed hyperlink colorSpecifies the color of hyperlinks that have already been followed.
If you enable this setting, hyperlinks that have been followed are displayed in the color you specified.
If you disable or do not configure this setting, the user's default setting is used.Underline hyperlinksShows hyperlinks with underlined text.
If you enable this setting, hyperlinks are underlined.
If you disable or do not configure this setting, the user's default setting is used.CalendarWeek starts onSpecifies the day of the week on which you want the scheduling week to begin.
If you enable this setting, weeks will start on the day you specified.
If you disable or do not configure this setting, the user's default setting is used.SundayMondayTuesdayWednesdayThursdayFridaySaturdayFiscal year starts inSpecifies the month that begins the fiscal year.
If you enable this setting, the fiscal year will start on the month you specified.
If you disable or do not configure this setting, the user's default setting is used.JanuaryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecemberUse starting year for FY numberingLabels the fiscal year using the calendar year in which the fiscal year begins.
If you enable this setting, the label for the fiscal year is the calendar year in which the fiscal year begins.
If you disable or do not configure this setting, the user's default setting is used.Default start timeSpecifies the start time that Project assigns to tasks by default when you enter a start date without specifying a time.
If you enable this setting, new tasks where the user does not enter a start time will use the start time that you specified.
If you disable or do not configure this setting, the user's default setting is used.Default end timeSpecifies the finish time that Project assigns to tasks by default when you enter a finish date without specifying a time.
If you enable this setting, new tasks where the user does not enter an end time will have the end time that you specified.
If you disable or do not configure this setting, the user's default setting is used.Default start time (Minutes after 12am * 10)Default end time (Minutes after 12am * 10)Hours per dayDefines the number of hours that you want Project to assign to a task when the user enters a duration of one day.
If you enable this setting, day-long tasks will be assigned the number of hours that you specified.
If you disable or do not configure this setting, the user's default setting is used.8Hours per weekSpecifies the number of hours that you want Project to assign to a task when the user enters a duration of one week.
If you enable this setting, week-long tasks will be assigned the number of hours that you specified.
If you disable or do not configure this setting, the user's default setting is used.40Days per monthDefines the number of days that you want Project to assign to a task when you enter a duration of a month.
If you enable this setting, month-long tasks will be assigned the number of days that you specified.
If you disable or do not configure this setting, the user's default setting is used.ScheduleSchedule options for Microsoft ProjectShow scheduling messagesDisplays messages about schedule inconsistencies, such as a successor task starting before the finish of the predecessor task.
If you enable this setting, users will be alerted about scheduling inconsistencies.
If you disable or do not configure this setting, the user's default setting is used.Show assignment units asShows resource assignments units as a decimal or percentage.
If you enable this setting, resource assignment units will be set to the option you choose from the list.
If you disable or do not configure this setting, the user's default setting is used.PercentageDecimalScheduling options for 'Project1'New tasksSpecifies the default start date for new tasks as they are entered in the current project. For projects scheduled from the start date, the options are "Start on Project Start Date" and "Start on Current Date." For projects scheduled from the finish date, the options are "Finish on Project Finish Date" and "Start on Current Date."
If you enable this setting, new tasks will start on the date you specified.
If you disable or do not configure this setting, the user's default setting is used.Set default start date for new tasksThis policy setting specifies the default start date for new tasks as they are entered in the current project. For projects scheduled from the start date, the options are "Start on Project Start Date" and "Start on Current Date." For projects scheduled from the finish date, the options are "Finish on Project Finish Date" and "Start on Current Date."
If you enable or do not configure this policy setting, new tasks will start on the project start date.
If you disable this policy setting, new tasks will not start on the project start date.Set new tasks to be automatically scheduledThis policy setting will set new tasks to be automatically scheduled.
If you enable this policy setting, new tasks will be automatically scheduled.
If you disable or do not configure this policy setting, new tasks will be manually scheduled.Update manually scheduled tasks when editing linksThis policy setting will allow the update of manually scheduled task dates when predecessor links are created or updated.
If you enable or do not configure this policy setting, manually scheduled task dates will be updated when predecessor links are created or updated.
If you disable this policy setting, manually scheduled task dates will not be updated when predecessor links are created or updated.Start on Project Start DateStart on Current DateDuration is entered inSpecifies the unit of time (minutes, hours, days, weeks, or months) used by default in the Duration field.
If you enable this setting, the unit you specify will be used if the user does not specify a unit of time when entering a duration.
If you disable or do not configure this setting, the user's default setting is used.Tasks can be made inactiveThis policy setting will allow tasks to be inactivated.
If you enable or do not configure this policy setting, users will be able to use the Inactive tasks feature, and tasks are allowed to be inactivated.
If you disable this policy setting, tasks cannot be inactivated.Keep tasks on nearest working dayThis policy setting will enable a constraint to be applied to tasks when they are toggled from Manually Scheduled Mode to Automatically Scheduled Mode, allowing the task date to be as close to the user-entered date as possible.
If you enable this policy setting, the task date will be as close to the user-entered date as possible when tasks are toggled from Manually Scheduled Mode to Automatically Scheduled Mode.
If you disable or do not configure this policy setting, the task date will not to be as close to the user-entered date when tasks are toggled from Manually Scheduled Mode to Automatically Scheduled Mode.Show tasks schedule warningsThis policy setting will allow the display of red task warnings to indicate potential problems.
If you enable or do not configure this policy setting, a red task warning will be displayed to indicate potential problems.
If you disable this policy setting, a red task warning will not be displayed to indicate potential problems.Show tasks schedule suggestionsThis policy setting will allow the display of green task suggestions to indicate potential optimization.
If you enable this policy setting, a green task suggestion will be displayed to indicate potential problems.
If you disable or do not configure this policy setting, a green task suggestion will not be displayed to indicate potential problems.MinutesHoursDaysWeeksMonthsWork is entered inSpecifies the default unit of time (minutes, hours, days, weeks, or months) used in the Work field in the current project.
If you enable this setting, whenever Project displays work values, the unit you specified will be used.
If you disable or do not configure this setting, the user's default setting is used.MinutesHoursDaysWeeksMonthsDefault task typeSpecifies the default task type for new tasks.
If you enable this setting, new tasks will be set to the type that you specified.
If you disable or do not configure this setting, the user's default setting is used.Fixed DurationFixed UnitsFixed WorkNew tasks are effort drivenThis policy setting specifies that new tasks are scheduled such that the work on the task remains constant as you add or remove assignments.
If you enable this policy setting, new tasks will be effort-driven.
If you disable or do not configure this policy setting, new tasks will not be effort-driven.Autolink inserted or moved tasksThis policy setting automatically links tasks when you cut, move, or insert them.
If you enable this policy setting, tasks will automatically be linked when you cut, move, or insert them.
If you disable or do not configure this policy setting, tasks will not automatically be linked when you cut, move, or insert them.Split in-progress tasksAllows rescheduling of remaining duration and work when a task slips or reports progress ahead of schedule.
If you enable this setting, the remaining duration and work will be rescheduled if a task slips or reports progress ahead of schedule.
If you disable or do not configure this setting, the user's default setting is used.Tasks will always honor their constraint datesSpecifies that Project schedules tasks according to their constraint dates.
If you enable this setting, task constraints will always be honored when tasks are scheduled.
If you disable or do not configure this setting, the user's default setting is used.Show that tasks have estimated durationsDisplays a question mark (?) after the duration unit of any task with an estimated duration.
If you enable this setting, tasks with estimated durations have a question mark after their duration unit.
If you disable or do not configure this setting, the user's default setting is used.New tasks have estimated durationsSpecifies that all new tasks have estimated durations.
If you enable this setting, all new tasks will require estimated durations.
If you disable or do not configure this setting, the user's default setting is used.CalculationCalculation options for Microsoft ProjectAutomatic CalculationSpecifies that calculations should be done automatically as soon as a change is made.
If you enable this setting, calculations will be made after every change to the project.
If you disable or do not configure this setting, the user's default setting is used.Calculate all open projectsSpecifies that Project should recalculate all open projects.
If you enable this setting, all open projects will be recalculated anytime Project does a calculation.
If you disable or do not configure this setting, the user's default setting is used.Calculation options for 'Project1'Updating task status updates resource statusAutomatically updates resource status, such as actual and remaining work and cost, whenever you update task status, such as percent complete, actual duration, or remaining duration.
If you enable this setting, task status updates are automatically applied to resources.
If you disable or do not configure this setting, the user's default setting is used.Edits to total task % complete will be spread to the status dateDistributes the changes to total percent complete evenly across the schedule to the project status date (or to the current date if you haven't specified a project status date).
If you enable this setting, edits to total task percent complete are evenly distributed across the schedule up to the status date.
If you disable or do not configure this setting, the user's default setting is used.Inserted projects are calculated like summary tasksSpecifies that a single critical path is calculated throughout the master project, by treating inserted projects as summary tasks in the master project.
If you enable this setting, the critical path is calculated by treating inserted projects as summary tasks.
If you disable or do not configure this setting, the user's default setting is used.Actual costs are always calculated by Microsoft ProjectSpecifies that Project calculates actual costs automatically, based upon resource rates, per-use resource costs, and fixed task costs.
If you enable this setting, Project will automatically calculate actual costs.
If you disable or do not configure this setting, the user's default setting is used.Edits to total actual cost will be spread to the status dateDistributes the changes to total actual cost evenly across the schedule to the status date (or to the current date if you have not specified a project status date).
If you enable this setting, Project will distribute edits to actual cost evenly across a task up to the status date.
If you disable or do not configure this setting, the user's default setting is used.Default fixed costs accrualSpecifies how Project sets the fixed cost accrual for new tasks.
If you enable this setting, new tasks will accrue fixed cost according to the specification you made.
If you disable or do not configure this setting, the user's default setting is used.StartProratedEndCalculate multiple critical pathsSpecifies that Project should calculate and display a critical path for each independent network of tasks within the project.
If you enable this setting, Project will calculate multiple critical paths.
If you disable or do not configure this setting, the user's default setting is used.Tasks are critical if slack is less than or equal toSpecifies the number of days of slack Project uses to determine critical tasks.
If you enable this setting, tasks are marked as critical if the slack is less than or equal to the value you specified.
If you disable or do not configure this setting, the user's default setting is used.Move end of completed parts after status date back to status dateMoves the completed portion of a task back to finish at the status date.
If you enable this setting, the completed portion of the task moves back to finish at the status date.
If you disable or do not configure this setting, the user's default setting is used.And move start of remaining parts back to status dateMoves the remaining portion of a task back to start at the status date.
If you enable this setting, the remaining portion of the task moves back to start at the status date.
If you disable or do not configure this setting, the user's default setting is used.Move start of remaining parts before status date forward to status dateMoves remaining portions of a task forward to start at the status date.
If you enable this setting, the remaining portion of the task moves forward to start at the status date.
If you disable or do not configure this setting, the user's default setting is used.And move end of completed parts forward to status dateMoves the completed portion of a task forward to finish at the status date.
If you enable this setting, the completed portion of the task moves forward to finish at the status date.
If you disable or do not configure this setting, the user's default setting is used.Earned Value options for Project1Default task Earned Value methodSpecifies the method used for earned value analysis.
If you enable this setting, Project will calculate earned value using the method you specified.
If you disable or do not configure this setting, the user's default setting is used.% CompletePhysical % CompleteBaseline for Earned Value calculationsSpecifies the baseline that is used to measure project performance using earned value analysis.
If you enable this setting, Project will calculate earned value using the baseline you specified.
If you disable or do not configure this setting, the user's default setting is used.BaselineBaseline 1Baseline 2Baseline 3Baseline 4Baseline 5Baseline 6Baseline 7Baseline 8Baseline 9Baseline 10SaveSave Microsoft Project files asSpecifies the default file format that should be applied when any Project file is saved.
If you enable this setting, project files will be saved with the format you specified.
If you disable or do not configure this setting, the user's default setting is used.Project (*.mpp)Template (*.mpt)Project 2000-2003 (*.mpp)File locationsProjectsSpecifies the default location in the computer system for saving and opening projects.
If you enable this policy setting, the location first appears in the Open and Save As dialog box.
If you disable or do not configure this policy setting, the users default for this setting is followed.User TemplatesSpecifies the default location in the computer system for saving and opening workgroup templates.
If you enable this policy setting, the location first appears in the Open and Save As dialog box.
If you disable or do not configure this policy setting, the users default for this setting is followed.Auto Save OptionsAuto Save everySpecifies that you want Project to automatically save your projects periodically.
If you enable this setting, Project will save users projects at the specified interval.
If you disable or do not configure this setting, the user's default setting is used.Save IntervalSpecifies how often Project should automatically save your projects. This setting is only used by Project if Auto Save has been turned on.
If you enable this setting, Project will save users projects at the specified interval.
If you disable or do not configure this setting, the user's default setting is used.Save Active Project onlySaves only the active project at the interval you specify. This setting is only used by Project if Auto Save is turned on.
If you enable this setting, Project will only save the active project at specified intervals.
If you disable or do not configure this setting, the user's default setting is used.Prompt before savingSpecifies whether Project should prompt the user before saving their project as a result of the Auto Save function.
If you enable this setting, users will be prompted before their project is automatically saved.
If you disable or do not configure this setting, the user's default setting is used.InterfaceShow indicators and Option butons forResource AssigmentsSpecifies that the feedback triangle should appear in a corner of a field if the user assigns additional resources to a task that already has resources assigned.
If you enable this setting, a feedback triangle is displayed in the corner of a field if users assign additional resources to a task that already has resources assigned.
If you disable or do not configure this setting, the user's default setting is used.Edits to work, units or durationSpecifies that the feedback triangle should appear in a corner of a Task Name field if you change the task's start date or finish date.
If you enable this setting, a feedback triangle is displayed in the corner of the Task Name field if the user changes the task's start or finish date.
If you disable or do not configure this setting, the user's default setting is used.Edits to start and finish datesSpecifies that the feedback triangle should appear in a corner of the Duration field or the Task Name field if you change a task's work, units, or duration.
If you enable this setting, a feedback triangle is displayed in the corner of the Duration or Task Name field if the user changes the task's work, units, or duration.
If you disable or do not configure this setting, the user's default setting is used.Deletions in the Name columnSpecifies that the delete indicator should appear in the Indicators field if you delete text in the Task Name or Resource Names field.
If you enable this setting, the delete indicator will appear if the user deletes a Task Name or Resource Names.
If you disable or do not configure this setting, the user's default setting is used.Project Guide settingsDisplay Project GuideDisplays the side pane containing the Project Guide.
If you enable this setting, the Project Guide will be displayed.
If you disable or do not configure this setting, the user's default setting is used.Project Guide settings for 'Project1'Project Guide Functionality and Layout pageChoose whether the side pane displays the default Project Guide or a custom Project Guide your organization has developed.
If you enable this setting, the Project Guide you specified will be displayed when the Project Guide is opened.
If you disable or do not configure this setting, the user's default setting is used.Use Microsoft Project's Default pageUse a custom pageURL: gbui://mainpage.htmProject Guide ContentSpecifies whether the side pane displays the Project Guide content that comes with Project or custom content that your organization has developed.
If you enable this setting, content for the Project Guide is loaded from the specified location.
If you disable or do not configure this setting, the user's default setting is used.Use Microsoft Project's default contentUse custom contentXML file for custom content:gbiu://gbui.xmlDisable Internal ID MatchingPrevent internal id matching. If you enable this setting, Project will not use internal identifiers to match different-language or renamed Organizer items between projects. If this setting is disabled or not configured, internal identifiers will be used to match different-language or renamed Organizer items between projects.Tools | MacroSecurityTrust CenterCryptographySet CNG cipher algorithmThis policy setting allows you to configure the CNG cipher algorithm that is used.
If you enable this policy setting, then the cipher provided will be used if it is a supported algorithm.
If you disable or do not configure this policy setting, AES will be used.Configure CNG cipher chaining modeThis policy setting allows you to configure the cipher chaining mode used.
If you enable this policy setting, the cipher chaining mode specified will be applied.
If you disable or do not configure this policy setting, Cipher Block Chaining (CBC) will be the default CNG cipher chaining mode used.Cipher Block Chaining (CBC)Cipher Feedback (CFB)Set CNG cipher key lengthThis policy setting allows you to configure the number of bits to use when creating the cipher key. This number will be rounded down to a multiple of 8.
If you enable this policy setting, the key bits specified will be used.
If you disable or do not configure this policy setting, the default value will be used.Set parameters for CNG contextThis policy setting allows you to specify the encryption parameters that should be used for the CNG context.
If you enable this policy setting, the parameters specified will be passed to the CNG context.
If you disable or do not configure this policy setting, the default CNG values will be used.Specify CNG hash algorithmThis policy setting allows you to specify the hash algorithm used.
If you enable this policy setting, the hashing algorithm selected will be used by CNG.
If you disable or do not configure this policy setting, the default CNG hash algorithm will be used.SHA1SHA256SHA384SHA512Set CNG password spin countThis policy setting allows you to specify the number of times to spin (rehash) the password verifier.
If you enable this policy setting, the number specified will be the number of times the password will be rehashed.
If you disable or do not configure this policy setting, the default (100000) will be used.Specify CNG random number generator algorithmThis policy setting allows you to configure the CNG random number generator to use.
If you enable this policy setting, the random number generator specified will be used.
If you disable or do not configure this policy setting, the default random number generator will be used.Specify CNG salt lengthThis policy setting allows you to specific the number of bytes of salt that should be used.
If you enable this policy setting, the bytes specified will be used.
If you disable or do not configure this policy setting, the default length or 16 will be used.Turn off Data Execution PreventionThis policy setting allows you to turn on and off Data Execution Prevention (DEP) for Project. DEP is a set of hardware and software technologies that perform additional checks on memory to help prevent malicious code from running on a system. The primary benefit of DEP is to help prevent code execution from data pages.
If you enable this policy setting, you will turn off DEP for Project.
If you disable or do not configure this policy setting, you will turn on DEP for Project.Security LevelSpecifies the level of security used when opening documents.
If you enable this policy setting, the security level you specified will be used when user open documents.
If you disable or do not configure this policy setting, the users default for this setting is followed.Low (not recommended)MediumHighVery HighTools | Local Project CacheLocal Project Cache LocationSets the location path of the local project cache on the user's computer.Local Project Cache Size Limit in MBSets the size limit in MB of the local project cache. This is applied per user profile. If this setting is enabled, the size of the cache will be set to the number specified. If this setting is disabled or not configured, users are able to set the cache size limit.New tasksDuration is entered inDefault fixed costs accrualDaysMinutesSave Microsoft Project files asProjectsCalendar TypeCalendar TypeProject Guide ContentDefault task Earned Value methodProject Guide Functionality and Layout pageDefault overtime rateWork is entered inLocal Project Cache LocationLocal Project Cache Size Limit in MBUser TemplatesDays per monthYearsWeeksWeek starts onHyperlink colorTasks are critical if slack is less than or equal toSave IntervalSecurity LevelMonthsShow assignment units asHours per weekFollowed hyperlink colorDefault task typeHoursUndo LevelsBaseline for Earned Value calculationsHours per dayFiscal year starts inDefault ViewMost Recently Used Template List LengthDefault standard rateDate FormatCalendar TypeDefault ViewDate FormatDefault Project CurrencyUndo LevelsNumber of entries: 0.00/h0.00/hMinutesHoursDaysWeeksMonthsYearsHyperlink colorFollowed hyperlink colorWeek starts onFiscal year starts inDefault start time (Minutes after 12am * 10)Default end time (Minutes after 12am * 10)840Days per monthShow assignment units asNew tasksDuration is entered inWork is entered inDefault task typeDefault task Earned Value methodBaseline for Earned Value calculationsDefault fixed costs accrualTasks are critical if slack is less than or equal toSave Microsoft Project files asSave IntervalProject Guide Functionality and Layout pagegbui://mainpage.htmProject Guide Contentgbiu://gbui.xmlCipher key lengthNumber of bytesSecurity LevelLocal Project Cache Size Limit in MBMost Recently Used Template List Length